Saturday, March 21, 2009

Getting Back to It

Even though the temperature never reached 50 degrees this afternoon, I got into the driveway, set up the workmates and cut the 3/4" maple plywood into two 2' x 6' pieces that will be laminated together to provide a heavy enough top for the long awaited workbench project.
~
The 3" thick plywood top will be trimmed with 3/4" solid maple that will be attached to the 1 1/2" thick mahogany endpieces with half blind dovetails. Plus we have to precisely cut in for the end vice that will be integrated into the top.
~
Tomorrow, I will glue and screw the top pieces of the worktop, then design and layout the end clamp.
~
It's good that the long awaited workbench project is underway, but I must simultaneously start the coffee table that I promised Mike that I would build for his new condo in Southie. That tabletop will be constructed from the thick fir mantle piece that we removed from the living room after the fire.
~
If this Spring proves to be relatively warm and dry, the Marblehead Gunning Dory will be resumed in full swing by June or so. It's conceivable that the Dory hull be substantially complete by the end of the summer, although the interior fit out will take quite a bit more time.

No comments: