These had to be spiled and cut on the bandsaw. Lots of trial and error. If done right though, the flooring will be a huge correction to the irregularities in the hull planks that were unruly at the bottom of the boat.
~
It's 11:15 AM on Sunday. I'll epoxy glue the slats to the bottom of the hull, clamp and glue the seat support planks to the gunwales, and finalize the centerboard sanding and attach the bottom logs with epoxy. Should be done by 2:30PM.
~
A shower, trip to Crosbys for the wings and other Patriots game stuff, and then I'll be ready for the Indianapolis Colts.
~
Not a bad plan.
~
It's 11:15 AM on Sunday. I'll epoxy glue the slats to the bottom of the hull, clamp and glue the seat support planks to the gunwales, and finalize the centerboard sanding and attach the bottom logs with epoxy. Should be done by 2:30PM.
~
A shower, trip to Crosbys for the wings and other Patriots game stuff, and then I'll be ready for the Indianapolis Colts.
~
Not a bad plan.
No comments:
Post a Comment